SOIL OXIDANT BLENDING- ISS/ ISCO BROWNFIELD SITE – ATLANTA, GA
Contaminants:
PCE, TCE, cis-1,
2-DCE
Treatment:
Soil Blending-ISS/ISCO injection
Site Status:
2018-2019; January 2020 Brownfield LOL
The site is a former dry cleaner with soil concentrations exceeding Type 3 RRS for PCE, TCE, andcis-1,2 DCE. The treatment area was 2,155 sf with a vertical profile of 5-17’.
-
Due to elevated soil concentrations,(>20ppm) the owners desired to preserve the building, and depth of impact (17’), a multi-phase ISCO/soil oxidant (combined remedy) plan was developed by EDEN.
-
The remediation plan included soil removal, on-site soil blending and stabilization guided by a treatability study, permanganate ISCO injections around building footers, and ISCO using 150 injection points.
-
Soils were removed using an excavator in rolls offs diameter auger borings. Soils failing TCLP were treated using a combination of CHP, sodium percarbonate, and calcium peroxide activated with ferrous sulfate with meta-kaolin added as a hardening agent.
-
1,200lbs of potassium permanganate combined with gravel was applied at the base of the excavation for long term groundwater treatment.
-
5,935 gallons of potassium permanganate was injected into150 closely spaced injection points for treatment inside the building. Blended soils passed TCLP testing, allowing for Subtitle D disposal. Confirmatory soil samples indicated commercial RRS were achieved. In addition, there was a significant reduction in dissolved PCE. Final Brownfield Limitation of Liability received January 2020